with Amado M. Mendoza, Jr.

(DP 2010-03)
Abstract

This study analyzes cross-country data extracted from a large global database to identify the major risks affecting Asian PPP into six major factors: (1) macroeconomic environment; openness of economy; (2) incentive issues during planning, design and contracting phases; (3) political risk; (4) fiscal capacity of government; (5) firm-embodied traits: level of technical efficiency and capacity of proponents in construction and operations; and (6) other reasons – regulation, credit risk of buyers of output, etc. Policy recommendations are made.

View or download the full paper here (.pdf): http://www.econ.upd.edu.ph/2010dp/DP2010-03.pdf